Skip to content

Buildings

Classroom Building Rehabilitation

Rehabilitation of a school classroom building, documented at the concrete column and ring beam stage.
±0.00+3.61+7.23Classroom Building RehabilitatIllustrative sectionPlaceholder

Introduction

About This Project

Rehabilitation of a school classroom building. The work was documented in July 2023 at the stage of casting the reinforced concrete columns and ring beams. Location, scope, and photos are still to be added.
Location
To be confirmed
Category
Buildings
Stage
Structure: concrete columns and ring beams, July 2023
Period
To be confirmed
Services
Construction, Rehabilitation

Drawings

Plan, Section, And Elevation

Illustrative drawings generated for this page. They are placeholders until the project drawings are published.
  • 1234ABCD1.901.773.13Classroom Building RehabilitatIllustrative planPlaceholder
  • ±0.00+3.25Classroom Building RehabilitatIllustrative sectionPlaceholder
  • Classroom Building RehabilitatIllustrative elevationPlaceholder

Gallery

Before, During, And After

Photos grouped by stage. Empty slots are kept for photos still to be added.

Before

Site or building before work started

  • 1234ABCD2.112.132.56Classroom Building RehabilitatIllustrative planPlaceholder

    Photo slot: before

  • Classroom Building RehabilitatIllustrative elevationPlaceholder

    Photo slot: before

During

Work in progress

  • 1234ABC2.742.151.91Classroom Building RehabilitatIllustrative planPlaceholder

    Photo slot: during

  • Classroom Building RehabilitatIllustrative elevationPlaceholder

    Photo slot: during

After

Finished work or final design

  • 1234ABC2.451.642.72Classroom Building RehabilitatIllustrative planPlaceholder

    Photo slot: after

  • Classroom Building RehabilitatIllustrative elevationPlaceholder

    Photo slot: after

Next project

Custom Furniture Collection

Kitchen sets, wardrobes, TV walls, and beds made to measure in HPL, duco, melamine, and wood.