Buildings
Classroom Building Rehabilitation
Rehabilitation of a school classroom building, documented at the concrete column and ring beam stage.
Introduction
About This Project
Rehabilitation of a school classroom building. The work was documented in July 2023 at the stage of casting the reinforced concrete columns and ring beams. Location, scope, and photos are still to be added.
- Location
- To be confirmed
- Category
- Buildings
- Stage
- Structure: concrete columns and ring beams, July 2023
- Period
- To be confirmed
- Services
- Construction, Rehabilitation
Drawings
Plan, Section, And Elevation
Illustrative drawings generated for this page. They are placeholders until the project drawings are published.
Gallery
Before, During, And After
Photos grouped by stage. Empty slots are kept for photos still to be added.
Before
Site or building before work started
Photo slot: before
Photo slot: before
During
Work in progress
Photo slot: during
Photo slot: during
After
Finished work or final design
Photo slot: after
Photo slot: after
Next project
Custom Furniture Collection
Kitchen sets, wardrobes, TV walls, and beds made to measure in HPL, duco, melamine, and wood.